12 Αυγούστου 2025
Rio–Antirrio Bridge: 21 Years of Contribution to Sustainable Development
With the completion of 21 years of continuous operation, the Rio–Antirrio Bridge today represents much more than a major technical achievement: it is a symbol of a Greece that dares and progresses — an infrastructure of national significance that continues to serve people, society, and the environment. On August 12, 2004, on the eve of the Athens Olympic Games, Greece made Charilaos Trikoupis’ vision a reality by inaugurating a project that radically transformed connectivity and daily life in Western Greece. The 21st anniversary is an opportunity for reflection and pride: for what has been accomplished, for the sustainable development achieved in the region, and for the exemplary role the Bridge continues to play in technical excellence, safety, and environmental responsibility.
Maintenance & Technological Excellence
As part of ongoing investment in the operational integrity of the project, heavy maintenance works on two expansion joints — which began in 2022 — were completed in early August, along with a new cycle of underwater inspections and maintenance carried out by divers using specialized technological equipment. In addition, in September, the alpinists willcarry out the annual inspection and maintenance cycle.
Every year, 3,342 structural elements of the Bridge undergo thorough inspections using a pioneering combination of innovation, cutting-edge technology, and human expertise — through the use of software, sensors, robotic vehicles, drones, and of course, specialized teams (alpinists, divers, etc.).
Connection with Regional Development
The operation of the Bridge over the past 21 years has been a catalyst for the economic, social, and touristic development of Western Greece, opening pathways for safe and sustainable mobility, and serving as a vital ally for the country, the economy, and regional development.
Focusing on People and the Environment
With full coverage of its energy needs from renewable sources since 2019 and a continuous reduction of its environmental footprint, the Rio–Antirrio Bridge remains a model of sustainable operation and future orientation. The international expertise of VINCI Highways, combined with the experience of the concession company, ensures the project’s technological and operational superiority.
The CEO of GEFYRA S.A., Mr. Panos Loukas, stated:
“The completion of the Patras–Pyrgos motorway section of Olympia Odos is another important step for safe and sustainable mobility, as well as for the development of Western Greece, highlighting the pivotal role of the Rio–Antirrio Bridge, which connects a modern and safe motorway network in Western Greece.
The Bridge is an outstanding example of the success of the concession model for implementing infrastructure projects in our country. Beyond being a landmark, it is a model of technical and operational excellence, combining the international expertise of VINCI Highways with the top-tier know-how developed by the concessioncompany.
The 21st anniversary is also an opportunity to remember what the Strait and the region were like before 2004, and to reflect on the momentum it has gained today, with tangible benefits for our fellow citizens and local communities.”
21 years later, the Bridge remains a timeless symbol of national pride — a project that not only connects two shores but envisions and serves the common good.
You can see the video here.